Discharge event
TALATON SPS · PSCSOEO · TALATON — rain test unavailable
event d2aec542-1965-4dae-82c7-1679e103d770 · pumping-station overflow (includes an emergency overflow)
This asset includes an emergency overflow, permitted to operate on pump or power failure — a different permit basis from storm relief. The feed does not say which function triggered this activation; the classification describes the rainfall record only.
Classification
Resultrain test unavailable
Started6 Jul 2026 · 11:48
Duration0h 07m · brief activation
Under 15 minutes: recorded as a brief activation. EDM monitors are documented to false-trigger on debris and sensor noise, so brief activations never enter headline dry-spill counts — see the method.
Hours with no rain recorded0h 00m
Rain · 24h / 48h / 7d at closeunavailable
Gauges used
Rainfall station6259 m
Rainfall station8081 m
Rainfall station9690 m