Discharge event
SUMMERHILL SPS · PSCSOEO · ILSINGTON — rain test unavailable
event 3ce4b1ae-088e-4e19-aaa8-116acd927e96 · pumping-station overflow (includes an emergency overflow)
This asset includes an emergency overflow, permitted to operate on pump or power failure — a different permit basis from storm relief. The feed does not say which function triggered this activation; the classification describes the rainfall record only.
Classification
Resultrain test unavailable
Started6 Jun 2026 · 05:06
Duration0h 53m
Hours with no rain recorded0h 00m
Rain · 24h / 48h / 7d at closeunavailable
Gauges used
Rainfall station3314 m
Rainfall station5118 m